Compare with Base Data

Compare tab allows user to compare changes in the project with the base data layer to identify any conflicts. This provides opportunity to identify and resolve any conflicts before attempting to merge.

CM-CHA~1_img20 It is not necessary to execute a refresh as the Compare function will look directly into the base data layer and compare to the current project the user is working in.

Note: The same comparison is automatically executed before a merge operation as well.

The results of the compare are displayed locations and components separately. Parent component and its children are grouped.  Expand to see location and component list

 

Compare

Location (1)

Components (11)

 

Name

 

PRJ00010

Base

 

Location (1)

 

 

 

 

NSW Netsite-TA

New

New

 

 

Components (11)

 

 

 

 

      FIST5(F2F)

Modified

Modified

Modified

 

Assembly: CM-CHA~1_img36      

 

...

...

 

Description      

 

change management

 

 

FIST5(F2F) FIST-TRAY

Deleted

Deleted

 

 

Stack Rack MX960-DC002(A)

Modified

Modified

Modified

 

Assembly: CM-CHA~1_img37      

 

...

 

 

Where applicable users can enter comparison page for finer granularity of operation. For example, MX960-DC002(A)CM-CHA~1_img38 Assembly. This will present the plan and the current operational states. You can see network interface DPCE 20x 1GE R EQ on slot 2/3 is the new component

Project 10, Slots (6), Group (0), Linked (0)

Base, Slots (6), Group (0), Linked (0)

Name

Type

Layer

Series/Slots

DC PSU

Generic PSU Interface

Layer 1

1 / 1-14

Routing Engine

Routing Engine

Layer 1

2 / 7

DPCE 20x 1GE + 2x 10GE R EQ

DPCE 20x 1GE + 2x 10GE R EQ

Layer 1

2 / 2

DPCE 20x 1GE R EQ

DPCE 20x 1GE R EQ

Layer 1

2 / 3

DPCE 20x 1GE + 2x 10GE R EQ

DPCE 20x 1GE + 2x 10GE R EQ

Layer 1

2 / 1

Routing Engine

Routing Engine

Layer 1

2 / 8

Name

Type

Layer

Series/Slots

DC PSU

Generic PSU Interface

Layer 1

1 / 1-14

Routing Engine

Routing Engine

Layer 1

2 / 7

DPCE 20x 1GE + 2x 10GE R EQ

DPCE 20x 1GE + 2x 10GE R EQ

Layer 1

2 / 2

DPCE 20x 1GE + 2x 10GE R EQ

DPCE 20x 1GE + 2x 10GE R EQ

Layer 1

2 / 1

Routing Engine

Routing Engine

Layer 1

2 / 8

If a conflict is detected for example if another project is merged beforehand that results in a conflicting change to operational. Conflict is highlighted. Go to assemble to view details.

Name

 

PRJ00010

Base

 

Location (1)

 

 

 

 

NSW Netsite-TA

New

New

 

 

Components (11)

 

 

 

 

      FIST5(F2F)

Modified

Modified

Modified

 

Assembly: CM-CHA~1_img39      

 

...

...

 

Description      

 

change management

 

 

FIST5(F2F) FIST-TRAY

Deleted

Deleted

 

 

Stack Rack MX960-DC002(A)

Modified

Modified

Modified

 

Assembly: CM-CHA~1_img40      

 

...

 

 

Stack Rack DC2-3750G(Master)

Modified

Modified

Modified

 

Assembly: CM-CHA~1_img41      

 

...

 

Conflict

100BaseFX

New

New

 

Conflict

 

Assembly details view show a card has been added to slot 1/6 and the new card planned for the same slot will cause a conflict

Project 10, Slots (6), Group (0), Linked (0)

Base, Slots (6), Group (0), Linked (0)

Name

Type

Layer

Series/Slots

3750G-24T-24(Slave#2)

3750G-24T-24(Master/Slave)

Layer 1

1 / 3

3750G-24T-24(Slave#3)

3750G-24T-24(Master/Slave)

Layer 1

1 / 4

3750G-24T-24(Slave#1)

3750G-24T-24(Master/Slave)

Layer 1

1 / 2

100BaseFX

100BASE-FX-10

Layer 1

1 / 6

3750G-24T-24(Master)

3750G-24T-24(Master/Slave)

Layer 1

1 / 1

Name

Type

Layer

Series/Slots

3750G-24T-24(Slave#2)

3750G-24T-24(Master/Slave)

Layer 1

1 / 3

3750G-24T-24(Slave#3)

3750G-24T-24(Master/Slave)

Layer 1

1 / 4

3750G-24T-24(Slave#1)

3750G-24T-24(Master/Slave)

Layer 1

1 / 2

100BaseFX

100BASE-LX

Layer 1

1 / 6

3750G-24T-24(Master)

3750G-24T-24(Master/Slave)

Layer 1

1 / 1